https://bayt.page.link/ttADFNK3Lbhhmsp78
أنشئ تنبيهًا وظيفيًا للوظائف المشابهة

الوصف الوظيفي

Rectification of VFD



Break Down Posted On: December 9, 2024 Closing On: December 11, 2024 Rectification of VFD
Chilled water circulation pump VFD #03 – Basement 1 ETS room
MAKE: ABB – 55 KW; MODEL – ACH580; SERIAL NO: 1164402678
· Rectification work in Control card & fan power supply
· Replacement work of Internal Cooling fan & low voltage capacitors
· To carry out necessary VI trace and functional test of all components
· General Service, Conformal coating & Preventive maintenance are to be done
· Testing & Commissioning
Note: Workmanship warranty for maintenance work and parts replacement to be provided.
No Subcontracting: In accordance to Jointly Owned Property Law No.6,2019, Notwithstanding anything in this Agreement, the vendor/contractor may not use any subcontractor to perform any of his obligations under this work order. Unless:
(a) Vendor has obtained the prior written consent of SAGA to the use of the subcontractor, and
(b) Vendor has entered into a separate written agreement with the subcontractor which requires the subcontractor to agree to and abide by all the terms and conditions of this Agreement.
The Community shall be deemed to be a third-party beneficiary of any such agreement between the vendor and a permitted subcontractor.
Notwithstanding the foregoing, the vendor shall not be relieved of any of its duties or obligations under this Agreement as a result of entering into a written agreement with a permitted subcontractor.
لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.