https://bayt.page.link/SbD4ZrVaSTqwcrce6
أنشئ تنبيهًا وظيفيًا للوظائف المشابهة

الوصف الوظيفي

Resolution of Kitchen Bad Smell from Exhaust System at Atlantic Tower.



Break Down Posted On: December 9, 2024 Closing On: December 19, 2024

Project Title:



Resolution of Kitchen Bad Smell from Exhaust System at Atlantic Tower.

Objective:



To identify, address and resolve the issue of unpleasant smells emanating from the kitchen exhaust system, ensuring optimal air quality and compliance with building standards.

Scope of Work



Inspection and Assessment:



Conduct a detailed site survey of the kitchen exhaust system to identify sources of unpleasant odors. Analyze airflow patterns to evaluate the performance of the exhaust system. Inspect and assess the condition of air filters, ductwork and exhaust fans for cleanliness, efficiency and operational issues.

Cleaning and Maintenance:



Thorough cleaning of air filters to remove grease, debris, and contaminants. Clean and sanitize ductwork to eliminate any buildup of grease or mold contributing to odors. Inspect and clean exhaust fans to ensure optimal performance and airflow.

Repairs and Modifications:



Seal any leaks in the duct system to prevent odor escape. Repair or replace damaged filters and ducts as necessary. Modify the exhaust system to ensure proper venting to the exterior of the building, avoiding the return of exhaust air to the car parking area.

Performance Testing and Commissioning:



Conduct pressure and airflow tests to confirm the system's functionality and compliance with industry standards. Ensure proper exhaust ventilation to the exterior and test for odor elimination.

Recommendations for Long-Term Maintenance:



Provide a detailed maintenance schedule, including quarterly service checks for high-demand systems. Recommend additional solutions such as secondary air purifiers or enhanced exhaust systems, if required.

Warranties



Material and Workmanship Warranty:



A minimum of 12 months warranty on all material installation, cleaning and repair work performed.

System Performance Warranty:



Guarantee of odor-free operation for a period of 12

months.



Maintenance Support:



Complimentary system check within 6 months of project completion.

NOTE TO VENDORSAs per the rules, all vendors supplying services in the Emirate of Dubai must have trade license issued by relevant authority in the Emirate of Dubai. Before you apply for any job in the Emirate of Dubai, please make sure to comply with regulatory requirements. Failure to do so can result in stoppage of funds through Escrow Account. *HOAM bears no liability towards any payment that is withheld by the Escrow Operator.


b. consider all risks, contingencies and other circumstances relating to the delivery of the Requirements and include adequate provision in its Proposal to manage such risks and contingencies. c. document in its Proposal all assumptions and qualifications made about the delivery of the Requirements, including any assumption that HOAM or a third party will deliver any aspect of the Requirements or incur any cost related to the delivery of the Requirements. 12. HOAM will convene an evaluation panel comprising members chosen for their relevant expertise and experience. In addition, HOAM may invite independent advisors to evaluate any Proposal, or any aspect of any Proposal. a. each Vendor’s understanding of the Requirements, capability to fully deliver the Requirements and willingness to meet the terms and conditions of the Proposed Contract 22. HOAM will advise Vendors if they have been shortlisted or not. Being shortlisted does not constitute acceptance by HOAM of the Vendor’s Proposal, or imply or create any obligation on HOAM to enter into negotiations with, or award a Contract for delivery of the Requirements to any shortlisted Vendor/s. At this stage in the RFP process HOAM will not make public the names of the shortlisted Vendors.
1. All enquiries regarding the RFP must be directed to HOAM’s Point of Contact.
2. Vendors must not directly or indirectly approach any representative of HOAM, or any other person, to solicit information concerning any aspect of the RFP.
3. Only the Point of Contact, and any authorised person of HOAM, are authorised to communicate with Vendors regarding any aspect of the RFP. HOAM will not be bound by any statement made by any other person.
4. HOAM may change the Point of Contact at any time. This notification may be posted on the system.
Where a Vendor has an existing contract with HOAM then business as usual communications, for the purpose of managing delivery of that contract, will continue using the usual contacts. Vendors must not use business as usual contacts to lobby HOAM, solicit information or discuss aspects of the RFP.
6. Each Vendor must accept and adhere to the Conflict of Interest declaration in the Response Form and must immediately inform HOAM should a Conflict of Interest arise during the RFP process. A material Conflict of Interest may result in the Vendor being disqualified from participating further in the RFP.
7. Vendors must not attempt to influence or provide any form of personal inducement, reward or benefit to any representative of HOAM in relation to the RFP.
8. A Vendor who attempts to do anything prohibited may be disqualified from participating further in the RFP process.
9. HOAM reserves the right to require additional declarations, or other evidence from a Vendor, or any other person, throughout the RFP process to ensure probity of the RFP process.
10. Vendors must not engage in collusive, deceptive or improper conduct in the preparation of their Proposals or other submissions or in any discussions or negotiations with HOAM. Such behaviour will result in the Vendor being disqualified from participating further in the RFP process. In submitting a Proposal the Vendor warrants that its Proposal has not been prepared in collusion with a Competitor.
11. HOAM reserves the right, at its discretion, to report suspected collusive or anticompetitive conduct by Vendors to the appropriate authority and to give that authority all relevant information including a Vendor’s Proposal.
12. HOAM and Vendor will each take reasonable steps to protect Confidential Information and, without limiting any confidentiality undertaking agreed between them, will not disclose Confidential Information to a third party without the other’s prior written consent.
13. HOAM and Vendor may each disclose Confidential Information to any person who is directly involved in the RFP process on its behalf, such as officers, employees, consultants, contractors, professional advisors, evaluation panel members, partners, principals or directors, but only for the purpose of participating in the RFP.
14. Vendors acknowledge that by law, HOAM will not be in breach of its obligations if Confidential Information is disclosed by HOAM to the appropriate authority because of suspected collusive or anticompetitive tendering behaviour. Where HOAM receives a request that relates to a Vendor’s Confidential Information HOAM will consult with the Vendor and may ask the Vendor to explain why the information is considered by the Vendor to be confidential or commercially sensitive.
15. For the duration of the RFP, to the date of the announcement of the Successful Vendor, or the end of the RFP process, the Vendor agrees to keep the RFP strictly confidential and not make any public statement to any third party in relation to any aspect of the RFP, the RFP process or the award of any Contract without HOAM’s prior written consent.
16. A Vendor may disclose RFP information to any person but only for the purpose of participating in the RFP. The Vendor must take reasonable steps to ensure that such recipients do not disclose Confidential Information to any other person or use Confidential Inf
لقد تجاوزت الحد الأقصى لعدد التنبيهات الوظيفية المسموح بإضافتها والذي يبلغ 15. يرجى حذف إحدى التنبيهات الوظيفية الحالية لإضافة تنبيه جديد
تم إنشاء تنبيه للوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.
تم إلغاء تفعيل تنبيه الوظائف المماثلة بنجاح. يمكنك إدارة التنبيهات عبر الذهاب إلى الإعدادات.